Estimate a constant two-axis pointing offset and a local affine log-gain trend from measured encoder angle and scalar received power. Decide whether to probe before collecting the new window. The method receives only a nominal whitelist: beam range, power bounds, sensor scales, receiver threshold, horizon, finite actuator set, offset prior, gain-slope bound, confidence level, probe library and diagnostic thresholds. Scenario name, true gain/offset, true actuator mismatch, sensor bias and fault timing are excluded from the decision interface.
The selected method is called UAD in code solely as a label. The research
contribution is the reference-relative certificate and uncertainty-aware mode
gate in relative_power_bound, power_envelope and uad_plan. It is not the
invention of constrained AFD, GLS, Kalman filtering or extremum seeking.
Observe measured angle qm and received power pm.
Apply the common three-sample anomaly trigger after warmup.
If no trigger, keep normal operation.
If detector is dark, abstain; do not identify a unique physical cause.
Construct simultaneous [pLow,pHigh] using known noise scale and mission horizon.
If pHigh < sensitivity: allow acquisition budget.
Else: retain working-link budget, including when status is uncertain.
Bound the current optical-error ball using offset prior and pLow/gain upper bound.
For each valid candidate with acceptable predicted information:
express predicted motion relative to measured current angle;
add predictor and current-angle uncertainty to a delivered-increment tube;
compute the conditional lower-power sequence;
count predicted below-threshold sampled duration;
keep the candidate only if duration <= the applicable outage budget.
Select minimum duration + weighted angular excitation from the feasible library.
If none is feasible: record abstention, no diagnosis credit.
Execute the selected causal held reference; collect measured angles/powers.
Fit offset and local log gain with iterated feasible GLS.
Reject censored/rank-deficient/inconsistent/imprecise windows.
If accepted, correct pointing only if its confidence-adjusted magnitude is
meaningful and estimated aligned power has sufficient lower margin.
Otherwise retain diagnosis/uncertainty without a futile correction.
There is one attempt per run. The tube assumes the known zero-reference history before that attempt; repeated diagnosis after a correction would need a history-initialized predictor and is outside this implementation.
The score is T + 0.03/(urad^2) * E, where T is seconds and E is angular
excitation in urad^2*s. It is a weighted tradeoff, not a lexicographic objective
or an electrical-energy model. Selection is exact over the finite library,
not over all feasible waveforms.
On the declared mission event, and if the actual actuator is in the finite set, the stage bounds hold, alpha and fixed offset are within their declared sets, and gain obeys the future ratio bound, actual sampled probe outage is bounded by the selected count. The probability of falsely enabling acquisition is at most delta under the known Gaussian marginal/scaling model. No unconditional continuous-time, flight, arbitrary-model or post-probe guarantee is asserted.
Noise-aware GLS uses small-noise approximations, not a proved exact confidence model. First-order information feasibility does not guarantee an accepted fit. The saved data separately records whether each certificate premise held and whether actual power/tube/budget violations occurred.
Original comparator classes remain available in the shared causal wrapper.
projected_noise isolates the noise-aware fit with fixed excitation.
UAD_no_tube removes delivered-motion uncertainty; UAD_point_gate removes
the simultaneous measurement gate. These ablations do not inherit the full
certificate. The parameter KF and ES are disclosed generic implementations,
selected on separate development seeds. ES’s larger time budget and lack of
diagnostic acceptance are explicit in tables.
Online search costs O(KH), the fit O(I N p^2+p^3), and candidate storage O(KH). Offline tube work is O(K M N) for fixed four-state matrices. Online wall time and retained array bytes are measured separately from simulation cost; neither is embedded worst-case timing or process peak memory.